STEC Waste Heat Recovery Boiler
페이지 정보

본문
Waste Heat Recovery Boiler
HEILONGJIANG BINZHOU Cement
2 x 9MW
2 clinker lines with the capacity of 4500+5000 ton/day
Operation since 2015
HEILONGJIANG BINZHOU Cement
2 x 9MW
2 clinker lines with the capacity of 4500+5000 ton/day
Operation since 2015
- PrevWaste Heat Recovery Power Plant 22.07.24
- NextBiomass Power Plant 22.07.24